FB160

Current Status - Almost Done


1/5 - FCP installed technology checked and ready to go. Need shock alarm on Mac from Barry. Take over headsets.

12/27 - Need to see that FCP has been installed by Andy and shock alarm installed by Barry.
Get headphones back from Jennifer and set up in here and 48. Signage?

12/22 - Sensory installed camera and mics. I was able to test out the system before they left and everything was working fine. Had to spend some time tweeking the sound mixer but it's all good now.

12/21 - iMac installed and set up. Checked projection, audio, ran some updates. Will let Andy know he needs to install FCP on this computer.

Mentioned the need for shock alarms in this room (one for iMac) and FB110 (two) to Barry. He will order more.

Spoke to Andy about loading FCP on this computer. It's already loaded on the two laptops in the back of JH048.

12/15 - Dec 22 is the date planned for Sensory to install in this room

12/10 - Mac to be delivered to this room and left in the corner. Room is available after 12/16 for us to set up Mac and move PC back to JH037. Julianne signed and delivered PO to Earl

12/9 - Met with Mike Hurst in FB160 to go over installation of camera, sound mixer and mics for Panopto. New to this estimate is second ceiling mic to get the entire room. Camera placement on back wall near door so angle will get most of room. Sound mixer to go in back rack taking the last spot there. Mac will be installed here (new 27 in iMac) with FCP at the instructor station. The PC here will go back to JH037 to run the slide show for the signage outside.






PB307

1/5 - Mike Hurst just called and a technician will be over to lower the cameras today. Jennifer will let them in and notify me when they get ready so I can verify the height. Moving complete and email sent to Craig Hardee about patching holes in the wall. Julianne said our budget will cover this.

12/23 - Have not heard anything about the scheduling of these camera's being moved. Will email Mike Hurst today to see if it's on their radar and when.

12/16 - Julianne sending payment info on to Earl. I need to keep on top of schedule for this work to be done before classes start.

12/14 - Jason emails Jennifer back that they don't think they should pay for it.

12/10 - Jennifer checked with Kent who said it would probably come from Lilly money so to check with Jason.

12/9 - Julianne signed Quote to move cameras down at the request of COPHS (Enz, Ockerman, Roscoe). Get an account # from COPHS so we can proceed. Jennifer should be able to help with this. Might check with Kent to start.